2026-10-29 · self-funded · United States · from the register

How 11 data center pauses ended

A common view is that a local pause is a rule-writing window: the town studies, writes standards, and approvals resume on clearer terms. The register can check that against every adopted local pause it holds that has already ended. Five of the 11 came out as written standards. Two ended in outright bans.

5BECAME WRITTEN STANDARDS
2BECAME OUTRIGHT BANS
3LAPSED, NOTHING RECORDED AFTER

The claim

Pauses usually end in a clearer set of standards rather than a closed door. Stated in public discussion of data center moratoria, October 2026.

The record

Every adopted local pause in the Calyx register whose stage is replaced or expired as of October 29, 2026: 11 places. Proposals that were voted down before adoption are not counted. Each row links to its register entry, which names its source document and says whether it was read in the original or taken from reporting.

The finding

Of 11 adopted local data center pauses that have ended, 5 were followed by written standards, 2 by outright bans, 1 by a longer extension, and 3 lapsed with no successor rule in the record.
PlacePauseOutcomeWhat followedSuccessor
Iron County, UTOrd. 2026-13, 180 daysStandardOrd. 2026-23, Strategic Development Zone overlay (Oct. 26, 2026)read; adoption reported
Coweta County, GA2025 moratoriumStandardOrd. 038-25, data center ordinance (Dec. 16, 2025)read
Covington, GA2026 moratoriumStandardData center supplemental-use section 16.20.195 (Aug. 2026)reported
Jerome Township, OH2025 moratoriumStandardData centers moved from permitted to conditional usereported
South Fulton, GARes. 2025-094StandardORD2026-024, special use permit and residential setback (Aug. 11, 2026)reported
Fayetteville, GA90-day moratoriumBanData centers prohibited in every zoning districtreported
St. Charles, MOR25-014, one yearBanBill 14085: data centers not listed as a use in any districtreported
Lexington-Fayette, KYJune 2026 moratoriumExtendedRes. 438-2026, extension into 2027read
Larimer County, COJan. 2026 moratoriumLapsedNothing recorded after Aug. 25, 2026read
Phillips County, CO2026 moratoriumLapsedNothing recorded after Aug. 27, 2026read
Newton County, GAApr. 2026 moratoriumLapsedNothing recorded after Oct. 7, 2026read

"Successor" says how the rule that followed is marked in the register: read in the original, or reported.

Unresolved in the record

The three lapsed pauses (Larimer and Phillips counties in Colorado, Newton County in Georgia) have no successor rule recorded. That can mean the place adopted nothing, or that a successor exists and the register has not found it yet.

What this does not establish

  • Eleven is a small number. 161 local pauses are still in effect, and how they end will change these shares.
  • The register does not hold every pause that has ended in the United States, only the ones it tracks.
  • Five of the successor rules are taken from reporting and have not yet been read in the original.
  • A written standard can still be strict. Jerome Township moved data centers from permitted to conditional use; South Fulton requires a special use permit and a residential setback.

Corrections